# Chapter 5: Concrete Material

5.1
General
5.1.1
Scope
The provisions of this Chapter shall apply to the design of reinforced and prestressed
concrete structures specified in Chapters 6, 8, 9 shall be applicable for normal weight
aggregate only unless otherwise specified.
5.1.2
Notation

==

Creep coefficient

==

Modulus of elasticity of concrete

==

Modulus of elasticity of reinforcement

==

Modulus of elasticity of concrete at the age of loading t
′
===

Specified compressive strength of concrete
′
\= Required average compressive strength of concrete used as the basis for
selection of concrete proportions

==

Specified yield strength of  reinforcement

\=
Coefficient of shrinkage

\=
Standard deviation

=

Unit weight of concrete

==

Creep strain in concrete
ℎ
==

Shrinkage of plain concrete

\=
Area of steel relative to that of the concrete.
5.2
Constituents  Of Concrete
5.2.1
Cement
5.2.1.1
Cement shall conform to one of the following specifications:
(a)
"Composition, Specification and Conformity Criteria for Common
Cements" (BDS EN 197-1:2003)
(b)
"Standard Specification for Portland Cement" ( ASTM C150/C150M)
(c)
"Standard Specification for Blended Hydraulic Cements" (ASTM
C595/C595M)
(d)
"Standard Performance Specification for Hydraulic Cement" (ASTM
C1157/C1157M)
5.2.1.2
Cement used in the construction shall be the same as that used in the
concrete mix design.

5.2.2
Aggregates
5.2.2.1
ঈড়হপৎবঃব ধমমৎবমধঃবং ংযধষষ পড়হভড়ৎস:ড়:যব ংঃধহফধৎফং ুঈড়ধৎংব ধহফ ঋরহব
অমমৎবমধঃবং ভৎড়স ঘধঃঁৎধষ ঝড়ঁৎপবং ভড়ৎ ঈড়হপৎবঃবচ্ (ইউঝ ২৪৩: ১৯৬৩);
ুঝঃধহফধৎফ ঝঢ়বপরভরপধঃরড়হ ভড়ৎ ঈড়হপৎবঃব অমমৎবমধঃবংচ্ (অঝঞগ ঈ৩৩/ঈ৩৩গ).
5.2.2.2
Maximum nominal size of coarse aggregate shall be the minimum of the
following:
(a)
One fifth (1/5) the  narrowest dimension between sides of forms,
(b)
One third (1/3) the depth of slabs,
(c)
Three fourth (3/4) the minimum clear spacing between individual
reinforcing bars, or bundles of bars, or prestressing tendons or ducts.
The above limitations may be relaxed if, in the judgment of the engineer, workability
and methods of consolidation are such that concrete can be placed without
honeycomb or voids.
5.2.2.3
Coarse aggregate made from Grade A brick as specified in BDS 208
"Specification for Common Building Clay Bricks" may be used in different types
slab and non-structural elements, except in applications where the ambient
environmental conditions may impair the performance of concrete made of such
aggregates.
5.2.3
Water
5.2.3.1
Water  used in mixing concrete shall be clean and free from injurious
amounts of oils, acids, alkalis, salts, organic materials, or other substances that may
be harmful to concrete or reinforcement.
5.2.3.2
For concrete wherein aluminium members will be embedded, mixing
water shall not contain harmful amounts of chloride ion as indicated in Sec 5.5.3.
5.2.3.3
Nonpotable water shall not be used in concrete except the following
conditions:
(a)
Selection of concrete proportions shall be based on concrete mixes using
water from the same source.
(b)
Nonpotable water is permitted only if specified comparative mortar test
cubes made with nonpotable water produce at least 90 percent of the
strength achieved with potable water.

5.2.4
Admixtures

##### 5.2.4.1 Prior approval of the engineer shall be required for the use of admixtures in

concrete. All admixtures shall conform to the requirements of this Section and Sec

#### 2.4.5 Chapter 2 Part 5.

##### 5.2.4.2 Admixture used in the work shall be the same as that used in the concrete

mix design.

##### 5.2.4.3 Admixtures containing chloride other than impurities from admixture

ingredients shall not be used in concrete containing embedded aluminium, or in
concrete cast against permanent galvanized metal forms (see Sections 5.5.1.2 and
5.5.2.1).

##### 5.2.4.4 Air entraining admixtures, if used in concrete, shall conform to

"Specification for Air entraining Admixtures for Concrete" (ASTM C260).

##### 5.2.4.5 Water reducing admixtures, retarding admixtures, accelerating admixtures,

water reducing and retarding admixtures, and water reducing and accelerating
admixtures, if used in concrete, shall conform to "Standard Specification for
Chemical Admixtures for Concrete" (ASTM C494/C494M) or "Standard
Specification for Chemical Admixtures for use in Producing Flowing Concrete"
(ASTM C1017/C1017M).

##### 5.2.4.6 Fly ash or other pozzolans used as admixtures shall conform to "Standard

Specification for Fly Ash and Raw or Calcined Natural Pozzolan for use as a Mineral
Admixture in Portland Cement Concrete " (ASTM C618).

##### 5.2.4.7 Ground granulated blast-furnace slag used as an admixture shall conform to

"Standard Specification for Ground Iron Blast Furnace Slag for use in Concrete and
Mortar" (ASTM C989).
5.3
Steel Reinforcement
5.3.1
General

##### 5.3.1.1 Steel reinforcement for concrete shall conform to the provisions of this

Section and those of Sec 2.4.6 Chapter 2 Part 5.

##### 5.3.1.2 Modulus of elasticity  for reinforcement shall be taken as 200 kN/mm2.

##### 5.3.1.3 Reinforcing bars to be welded shall be indicated on the drawings and

welding procedure to be used shall be specified. Reinforcing bars otherwise
conforming to BDS ISO 6935-2, shall also possess material properties necessary to
conform to welding procedures specified in "Structural Welding Code - Reinforcing
Steel" (AWS D1.4) of the American Welding Society.

5.3.2
Deformed Reinforcement

##### 5.3.2.1 Deformed reinforcing bars shall conform to one of the following

specifications:
(a)
"Bangladesh Standard Steel for the reinforcement of concrete Part-1;
Plain bars" (BDS ISO 6935-1 and "Bangladesh Standard Steel for the
reinforcement of concrete Part-2; Ribbed bars" (BDS ISO 6935-2)
(b)
"Standard Specification for Deformed and Plain Billet Steel Bars for
Concrete Reinforcement" (ASTM A615/A615M),
(c)
"Standard Specification for Rail Steel Deformed and Plain Bars for
Concrete Reinforcement" Including Supplementary Requirements S1
(ASTM A996/A996M),
(d)
"Standard Specification for Axle Steel Deformed and Plain Bars for
Concrete Reinforcement" (ASTM A996/A996M),
(e)
"Standard Specification for Low Alloy Steel Deformed Bars for
Concrete Reinforcement" (ASTM A706/A706M),
(f)
"Specification for Cold Worked Steel Bars for the Reinforcement of
Concrete" (BS 4461).

##### 5.3.2.2 Deformed reinforcing bars with a specified yield strength  exceeding 420

N/mm2 shall be permitted, provided  shall be the stress corresponding to a strain of

### 0.35 percent and the  bars otherwise conform to one of the ASTM specifications

listed in Sec 5.3.2.1 (Also see Sec 6.1.2.5).

##### 5.3.2.3 Galvanized reinforcing bars shall comply with "Standard Specification for

Zinc Coated (Galvanized) Steel Bars for Concrete Reinforcement" (ASTM A767/
A767M). Epoxy coated reinforcing bars shall comply with "Standard Specifications
for Epoxy Coated Reinforcing Steel Bars" (ASTM A775/A775M). Galvanized or
epoxy coated reinforcement shall also conform to one of the standards listed in Sec

##### 5.3.2.1 above.

5.3.3
Plain Reinforcement

##### 5.3.3.1 Plain bars shall conform to one of the specifications listed in Section 5.3.2.1

(a), (b), (c) or (d).

##### 5.3.3.2 Plain wire shall conform to "Standard Specification for Steel Wire, Plain, for

Concrete Reinforcement" (ASTM A82/A82M) except that for wire with a specified
yield strength  exceeding 420 N/mm2,  shall be the stress corresponding to a
strain of 0.0035.

##### 5.3.3.3 Plain bars and wire may be used as ties, stirrups  and spirals for all structural

members and for all  reinforcement in structures up to 4-storey high.

5.3.4
Structural Steel, Steel Pipe  or Tubing

##### 5.3.4.1 Structural steel used with reinforcing bars in composite compression

members meeting the requirements of Sec 6.3.10.8 or Sec 6.3.10.9 of Chapter 6 of
this Part shall conform to one of the following specifications:
(a)
"Standard Specification for Structural Steel" (ASTM A36/A36M),
(b)
"Standard Specification for High Strength Low Alloy Structural
Steel"(ASTM A242/A242M),
(c)
"Standard Specification for High Strength Low Alloy Structural
Manganese Vanadium Steel" (ASTM A572/A572M),
(d)
"Standard Specification for High Strength Low Alloy Columbium-
Vanadium Steels of Structural Quality" (ASTM A572/A572M),
(e)
"Standard Specification of High Strength Low Alloy Structural Steel with
50 ksi (345 Mpa) Minimum Yield Point to 4 in (100 mm) Thick" (ASTM
A588/A588M).

##### 5.3.4.2  Steel pipe or tubing for composite compression members composed of a

steel encased concrete core meeting the requirements of Sec 6.3.10.7 Chapter 6 of
this Part shall conform to one of the following specifications:
(a)
Grade B of "Standard Specification for Pipe, Steel, Black and Hot
Dipped, Zinc Coated Welded and Seamless" (ASTM A53/A53M).
(b)
"Standard Specification for Cold Formed Welded and Seamless Carbon
Steel Structural Tubing in Rounds and Shapes" (ASTM A500/A500M).
(c)
"Standard Specification for Hot Formed Welded and Seamless Carbon
Steel Structural Tubing" (ASTM A501).
5.4
Workability  Of Concrete
Concrete mix proportions shall be such that the concrete is of adequate workability
and can properly be compacted. Suggested ranges of values of workability of
concrete for some placing conditions, are given in Table 6.5.1.
5.5
Durability Of Concrete
5.5.1
Special Exposures

##### 5.5.1.1 For concrete intended to have low permeability when exposed to water, the

water cement ratio shall not exceed 0.50.

##### 5.5.1.2 For corrosion protection of reinforced concrete exposed to brackish water,

sea water or spray from these sources, the water cement ratio shall not exceed 0.4.
If minimum concrete cover required by Sec 8.1.8 Chapter 8 of this Part is increased
by 12 mm, water cement ratio may be increased to 0.45.

##### 5.5.1.3 The water cement ratio required in Sections 5.5.1.1 and 5.5.1.2 above and

Table 6.5.2 shall be calculated using the weight of cement meeting the requirements
of BDS EN-197-1 or ASTM C595/C595M or C1157/C1157M, plus the weight of fly
ash or pozzolan satisfying ASTM C618 and/or slag satisfying ASTM C989, if any.
5.5.2
Sulphate Exposures

##### 5.5.2.1 Concrete to be exposed to sulphate containing solutions or soils shall

conform to the requirements of Table 6.5.2 or be made with a cement that provides
sulphate resistance with the maximum water cement ratio provided in Table 6.5.2.

##### 5.5.2.2 Calcium chloride shall not be used as an admixture in concrete exposed to

severe or very severe sulphate containing solutions, as defined in Table 6.5.2.
Table 6.5.1: Suggested Workability of Concrete for Various Placing Conditions
Placing  Conditions
Degree of
Workability
Values of Workability
Concreting of thin sections with
vibration
Very low
20-10 seconds Vee-Bee time, or
0.75-0.80 compacting factor
Concreting of lightly reinforced
sections with vibration
Low
10-5 seconds Vee-Bee time, or
0.80-0.85  compacting factor
Concreting of lightly reinforced
sections without vibration or
heavily reinforced section with
vibration
Medium
5-2 seconds Vee-Bee time, or 0.85-

### 0.92 compacting  factor, or 25-75

mm slump for 20 mm aggregate\*
Concreting of heavily rein-forced
sections without vibration
High
Above 0.92  compacting factor, or
75-125 mm slump for 20 mm
aggregate\*

* Slump test shall be performed as per ASTM C143. For smaller aggregates the values
  will be lower.

Table 6.5.2: Requirements for Normal Weight Aggregate Concrete Exposed to
Sulphate Containing Solutions
Sulphate
Exposure

Water Soluble
Sulphate (SO4)
in Soil, percent
by  Weight
Sulphate (SO4)
in Water, (ppm)
Cement Type1
Maximum
Water Cement
Ratio, by
Weight
Negligible
0.00-0.10
0 – 150
-------

*

Moderate2
0.10-0.20
150 -1500
Other than CEM I and
B type
0.50
Severe
0.20-2.00
1500 -10,000
Other than CEM-I and
B type
0.45
Very
severe
Over 2.00
Over 10,000
Other than CEM-I and
B type
0.45
Notes: Pozzolan that has been determined by test or service record to improve sulphate
resistance when used in concrete containing Type V cement.
1  For types of cement see BDS EN 197-1:2003 or ASTM C150 and C595
2 Sea water
Table 6.5.3: Maximum Chloride-ion Content for Corrosion Protection
Type of Member
Maximum Water Soluble Chloride Ion (Cl-)
in Concrete,  Percent by  Weight of Cement
Prestressed concrete
0.06
Reinforced concrete exposed to
chloride in service
0.15
Reinforced concrete that will be dry or
protected from moisture in service
1.00
Other reinforced concrete construction
0.30
5.5.3
Corrosion of Reinforcement

##### 5.5.3.1 For

corrosion
protection,
maximum
water
soluble
chloride
ion
concentrations in hardened concrete at ages from 28 to 42 days contributed from the
ingredients including water, aggregates, cementitious materials, and admixtures,
shall not exceed the limits of Table 6.5.3. When testing is performed to determine
water soluble chloride ion content, test procedure shall conform to AASHTO T260,
"Methods of Sampling and Testing for Total Chloride Ion in Concrete and Concrete
Raw Materials".

##### 5.5.3.2 When reinforced concrete will be exposed to brackish water, sea water, or

spray from these sources, requirements of Sections 5.5.1.1 and 5.5.1.2 for water
cement ratio, or concrete strength and minimum cover requirements of Sec 8.1.8
Chapter 8 of this Part shall be satisfied.
5.5.4
Minimum Concrete Strength
Minimum concrete strength for structural use of reinforced concrete shall be 20
N/mm2. However, for buildings up to 4 storey, the minimum concrete strength may
be relaxed to 17 N/mm2.
5.6
Concrete Mix Proportion
5.6.1
General

##### 5.6.1.1 Proportions of materials for concrete shall be such that :

(a)
Workability and consistency are achieved for proper placement into
forms and around reinforcement, without segregation or excessive
bleeding;
(b)
Resistance to special exposures to meet the durability requirements of Sec

### 5.5 are provided; and

(c)
Conformance with strength test requirements of Sec 5.12 is ensured.

##### 5.6.1.2 Where different materials are to be used for different portions of the

proposed work, each combination shall be evaluated.

##### 5.6.1.3 Concrete proportions, including water cement ratio, shall be established on

the basis of field experience and/or trial mixtures with materials to be employed (Sec
5.6.2) except as permitted in Sec 5.6.3 or required by Sec 5.5.
5.6.2
Proportioning Concrete Mix on the Basis of Field Experience and/or
Trial Mixtures

##### 5.6.2.1 Standard deviation

(a)
A standard deviation shall be established where test records are available
in a concrete production facility. Test records from which a standard
deviation is calculated shall meet the following requirements :
(i)
These shall represent materials, quality control procedures, and
conditions similar to those expected for the proposed work.
Deviations in materials and proportions for the proposed work shall
be more restricted than those within the test records.

(ii) Test records shall represent concrete produced to meet a specified
strength  ′ within 7 N/mm2 of that specified for the proposed work.
(iii) The record shall consist of at least 30 consecutive tests or two
groups of consecutive tests totaling at least 30 tests as defined in Sec

##### 5.12.2.4 except as provided in (b) below.

(b)
Where a concrete production facility does not have test records meeting
the requirements of (a) above but does have a record based on 15 to 29
consecutive tests, a standard deviation shall be established as the product
of the calculated standard deviation and the modification factor specified
in Table 6.5.4. However, the test records shall meet the requirements (i)
and (ii) of (a) above  and represent only a single record of consecutive
tests that span a period of not less than 45 calendar days.
Table 6.5.4: Modification Factor for Standard Deviation when Less Than 30
Tests are Available
No. of Tests\*
Modification Factor for Standard Deviation\*\*
Less than 15
See Section 5.6.2.2(b)
1.16
1.08
1.03
30 or more
1.00

* Interpolate for intermediate numbers of tests
  \*\* Modified standard deviation to be used to determine the required average
  strength 
  f cr from Sec 5.6.2.2(a).

##### 5.6.2.2 Required average strength

(a)
Required average compressive strength  ′  used as the basis for selection
of concrete proportions shall be the larger of the values given by Eq
(6.5.1) and (6.5.2) using a standard deviation calculated in accordance
with  Sec 5.6.2.1(a) or Sec 5.6.2.1(b) above.
′ = ′ + 1.34

(6.5.1)
′ = ′ + 2.33
−3.5
(6.5.2)

(b)
When a concrete production facility does not have field strength test
records for calculation of standard deviation meeting the requirements of
Sec 5.6.2.1(a) or Sec 5.6.2.1(b), the required average strength shall be
determined from Table 6.5.5 and documentation of the average strength
shall be in accordance with the requirements of Sec 5.6.2.3 below.
Table 6.5.5: Required Average Compressive Strength when Data are not
available
to establish a Standard Deviation
Specified Compressive Strength
c
f 
N/mm2
Required Average Compressive Strength,  
′
N/mm2
Less than 20

′+ 7.0
20 to 35

′ +  8.5
Over  35

′+ 10.0

##### 5.6.2.3 Documentation of average strength

Documentation shall be prepared to demonstrate that the proposed concrete
proportions will produce an average compressive strength equal to or greater than the
required average compressive strength (Sec 5.6.2.2). Such documentation shall
consist of one or more field strength test records or trial mixtures.
(a)
When test records are used to demonstrate that proposed concrete
proportions will produce the required average strength  ′ (Sec 5.6.2.2)
such records shall represent materials and conditions similar to those
expected. Deviations in materials, conditions and proportions within the
test records shall not have been more restricted than those for proposed
work. For the purpose of documenting average strength potential, test
records consisting of less than 30 but not less than 10 consecutive tests
are acceptable provided the test records encompass a period of time not
less than 45 days. Required concrete proportions shall be permitted to be
established by interpolation between the strengths and proportions of two
or more test records each of which meets other requirements of this
Section.
(b)
When an acceptable record of field test results is not available, concrete
proportions may be established based on trial mixtures meeting the
following restrictions :
(i)
Combination of materials shall be those for the proposed work.
(ii) Trial mixtures having proportions and consistencies required for the
proposed work shall be made using at least three different water
cement ratios or cement contents that will produce a range of
strengths encompassing the required average strength.

(iii) Trial mixtures shall be designed to produce a slump within ±20 mm
of the maximum permitted, and for air entrained concrete the air
content shall be within ±0.5 percent of the maximum allowable.
(iv) For each water cement ratio or cement content, at least three test
cylinders for each test age shall be made and cured in accordance
with "Method of Making and Curing Concrete Test Specimens in
the Laboratory" (ASTM C192/C192M). Cylinders shall be tested at
28 days or at test age designated for the determination of ′ .
(v)
From the results of cylinder tests, a curve shall be plotted showing
the relationship between the water cement ratio or cement content
and the compressive strength at designated test age.
(vi) Maximum water cement ratio or minimum cement content for
concrete to be used in the proposed work shall be that shown by the
above curve to produce the average strength required by Sec 5.6.2.2
unless a lower water cement ratio or higher strength is required by
Sec 5.5.
5.6.3
Proportioning by Water Cement Ratio

##### 5.6.3.1 If the data required in Sec 5.6.2 are not available, concrete proportions shall

be based on water cement ratio limits specified in Table 6.5.6 when approved by the
engineer.

##### 5.6.3.2 Table 6.5.6 shall be used for concrete to be made with cements meeting

ংঃৎবহমঃয ৎবয়ঁরৎবসবহঃং ড়ভ ুইধহমষধফবংয ঝঃধহফধৎফ ঈবসবহঃ চধৎঃ-১: ঈড়সঢ়ড়ংরঃরড়হ,
ংঢ়বপরভরপধঃরড়হং ধহফ পড়হভড়ৎসরঃু পৎরঃবৎরধ ভড়ৎ পড়সসড়হ পবসবহঃংচ্ (ইউঝ ঊঘ ১৯৭-১: ২০০৩),
and shall not be applied to concrete containing lightweight aggregates or admixtures
other than those for entraining air.

##### 5.6.3.3 Concrete proportioned by water cement ratio limits prescribed in Table 6.5.6

shall also conform to special exposure requirements of Sec 5.5 and to compressive
strength test criteria of Sec 5.12.
5.6.4
Average Strength Reduction
As data become available during construction, amount by which value of  ′ must
exceed specified value of  ′  may be reduced, provided:
(a)
30 or more test results are available and the average of test results
exceeds that required by Sec 5.6.2.2(a) using a standard deviation
calculated in accordance with Sec 5.6.2.1(a), or
(b)
15 to 29 test results are available and the average of test results exceeds
that required by Sec 5.6.2.2(a) using a standard deviation calculated in
accordance with Sec 5.6.2.1(b), and provided further that special exposure
requirements of Sec 5.5 are met.

Table 6.5.6: Maximum Permissible Water Cement Ratios for Concrete when
Strength Data from Field Experience or Trail Mixers are not Available
Specified Compressive
Strength\*, 
′
N/mm2
Absolute Water Cement Ratio by Weight
Concrete other than air-
entrained
Air-entrained
concrete
0.66
0.60
0.50
0.40
\*\*
0.54
0.49
0.39
\*\*
\*\*

* 28 day strength.  With most materials, water cement ratios shown will provide
  average strengths greater than that required in Sec 5.6.2.2.
  \*\*  For strengths above 30 N/mm2 (25 N/mm2 for air entrained concrete) concrete
  proportions shall be established by methods of Sec 5.6.2.
  5.7
  Preparation of Equipment and Place of Deposit
  Preparation before concrete placement shall include the following:
  (a)
  All equipment for mixing and transporting concrete shall be clean.
  (b)
  All debris shall be removed from spaces to be occupied by concrete.
  (c)
  Forms shall be properly cleaned and coated.
  (d)
  Masonry filler units that will be in contact with concrete shall be soaked
  thoroughly.
  (e)
  Reinforcement shall be thoroughly clean of deleterious coatings.
  (f)
  Water shall be removed from place of deposit before concrete is placed
  unless a tremie is used or unless otherwise permitted by the engineer.
  (g)
  All laitance and other unsound material shall be removed before
  additional concrete is placed against hardened concrete.

5.8
Mixing
5.8.1
All concrete shall be mixed thoroughly until there is a uniform distribution
of materials and shall be discharged completely before the mixer is recharged.
5.8.2
Ready mixed concrete shall be mixed and delivered in accordance with the
requirements of "Standard Specification for Ready Mixed Concrete" (ASTM C94) or
"Standard Specification for Concrete Made by Volumetric Batching and Continuous
Mixing" (ASTM C685).
5.8.3
Job mixed concrete shall be mixed in accordance with the following:
(a)
Mixing shall be done in a batch mixer of approved type.
(b)
Mixer shall be rotated at a speed recommended by the manufacturer.
(c)
Mixing shall be continued for at least 90 seconds after all materials are in
the drum, unless a shorter time is shown to be satisfactory by the mixing
uniformity tests of "Specification for Ready Mixed Concrete" (ASTM
C94).
(d)
Materials handling, batching, and mixing shall conform to the applicable
provisions of "Specification for Ready Mixed Concrete" (ASTM C94).
(e)
A detailed record shall be kept to identify:
(i)
number of batches produced;
(ii) proportions of materials used;
(iii) approximate location of final deposit in structure;
(iv) time and date of mixing and placing.
5.9
Conveying
5.9.1
Concrete shall be conveyed from the mixer to the place of final deposit by
methods that will prevent segregation or loss of materials.
5.9.2
Conveying equipment shall be capable of providing a supply of concrete to
the place of deposit without segregation of ingredients and without interruptions
sufficient to permit loss of plasticity between successive increments.
5.10
Depositing

#### 5.10.1 Concrete shall be deposited as near its final position as practical to avoid

segregation due to rehandling or flowing.

#### 5.10.2 Concreting shall be carried on at such a rate that concrete is at all times

plastic and flows readily into spaces between and around the reinforcement.

#### 5.10.3 Concrete that has partially hardened or been contaminated by foreign

materials shall not be deposited in the structure.

#### 5.10.4 Retempered concrete or concrete that has been remixed after initial set shall

not be used.

#### 5.10.5 After concreting is started, it shall be carried on as a continuous operation

until placing of a panel or section, as defined by its boundaries or predetermined
joints, is completed except as permitted or prohibited by Sec 5.16.4.

#### 5.10.6 Top surfaces of vertically formed lifts shall be generally level.

#### 5.10.7 When construction joints are required, joints shall be made in accordance

with Sec 5.16.4.

#### 5.10.8 All concrete shall be thoroughly consolidated by suitable means during

placement and shall be thoroughly worked around reinforcement and embedded
fixtures and into corners of forms.
5.11
Curing

#### 5.11.1 Concrete (other than high early strength) shall be maintained above 10oC

and in a moist condition for at least the first 7 days after placement, except when
cured in accordance with Sec 5.11.3.

#### 5.11.2 High early strength concrete shall be maintained above 10oC and in a moist

condition for at least the first 3 days, except when cured in accordance with Sec
5.11.3.

#### 5.11.3 Accelerated Curing

5.11.3.1
Curing by high pressure steam, steam at atmospheric pressure, heat and
moisture or other accepted processes, shall be permitted to accelerate strength gain
and reduce time of curing.
5.11.3.2
Accelerated curing shall provide a compressive strength of the concrete at
the load stage considered, at least equal to the required design strength at that load
stage.
5.11.3.3
Curing process shall be such as to produce concrete with a durability at
least equivalent to that obtained for concrete cured by the method of Sec 5.11.1 or
5.11.2.

#### 5.11.4 When required by the engineer, supplementary strength tests in accordance

with Sec 5.12.4 shall be performed to assure that curing is satisfactory.

5.12
Evaluation and Acceptance of Concrete

#### 5.12.1 General

5.12.1.1
Concrete shall be proportioned to provide an average compressive
strength as prescribed in Sec 5.6.2.2 as well as to satisfy the durability criteria of Sec
5.5. Concrete shall be produced to limit frequency of strengths below ′  to that
prescribed in Sec 5.12.3.3.
5.12.1.2
Requirements of shall be based on tests of cylinders made and tested as
prescribed in Sec 5.12.3.
5.12.1.3
Unless otherwise specified, ′  shall be based on 28 day tests. Test age
for  ′ shall be indicated in design drawings or specifications, if it is different from
28 days.
5.12.1.4
Splitting tensile strength tests shall not be used as a basis for field
acceptance of concrete.

#### 5.12.2 Frequency of Testing

5.12.2.1
Samples for strength tests of each class of concrete placed each day shall
be taken not less than once a day, nor less than once for each 60 m3 of concrete, nor
less than once for each 250 m2 surface area for slabs or walls.
5.12.2.2
On a given project, if the total volume of concrete is such that frequency
of testing required by Sec 5.12.2.1 above would provide less than three strength tests
for a given class of concrete, tests shall be made from at least three randomly
selected batches or from each batch if three or fewer  batches are used.
5.12.2.3
When the total quantity of a given class of concrete is less than 20 m3,
strength tests are not required when evidence of satisfactory strength is submitted to
and approved by the Engineer.
5.12.2.4
A strength test shall be the average of the strengths of at least two 150
mm by 300 mm cylinders or at least three 100 mm by 200 mm cylinders made from
the same sample of concrete and tested at 28 days or at test age designated for
determination of ′.

#### 5.12.3 Laboratory Cured Specimens

##### 5.12.3.1  Samples for strength tests shall be taken in accordance with "Method of

Sampling Freshly Mixed Concrete" (ASTM C172).

##### 5.12.3.2  Cylinders for strength tests shall be moulded and laboratory cured in

accordance with "Practice for Making and Curing Concrete Test Specimens in the
Field" (ASTM C31/C31M) and tested in accordance with "Test Method for
Compressive Strength of Cylindrical Concrete Specimens" (ASTM C39/C39M).

##### 5.12.3.3  Strength level of an individual class of concrete shall be considered

satisfactory if both of the following requirements are met :
(a)
Average of three consecutive strength tests (see Sec 5.12.2.4) equals or
exceeds  ′
(b)
No individual strength test (average of two cylinders of 150 mm by
300 mm or average of three cylinders of 100 mm by 200 mm) falls
below by more than 3.5 N/mm2.
5.12.3.4
If either of the requirements of Sec 5.12.3.3 are not met, steps shall be
taken to increase the average of the subsequent strength test results. Requirements of
Sec 5.12.5 shall be satisfied if the requirement of Sec 5.12.3.3(b) is not met.

#### 5.12.4 Field Cured Specimens

5.12.4.1
The engineer may require strength tests of cylinders cured under field
conditions to check adequacy of curing and protection of concrete in the structure.
5.12.4.2
Field cured cylinders shall be cured under field conditions in accordance
with "Practice for Making and Curing Concrete Test Specimens in the Field" (ASTM
C31/C31M).
5.12.4.3
Field cured test cylinders shall be moulded at the same time and from
the same samples as laboratory cured test cylinders.
5.12.4.4
Procedures for protecting and curing concrete shall be improved when
the strength of field cured cylinders at the test age designated for determination of  ′
is less than 85 percent of that of companion laboratory cured cylinders. The 85
percent limitation shall not apply if field cured strength exceeds  ′ by more than 3.5
N/mm2.

#### 5.12.5 Investigation of Low Strength Test Results

5.12.5.1
If the result of any strength test (Sec 5.12.2.4)  of laboratory cured
cylinders falls below the specified value of by more than 3.5 N/mm2 (Sec
5.12.3.3(b)) or if tests of field cured cylinders indicate deficiencies in protection and
curing (Sec 5.12.4.4), steps shall be taken to assure that the load carrying capacity of
the structure is not jeopardized.
5.12.5.2
If the likelihood of low strength concrete is confirmed and computations
indicate that load carrying capacity may have been significantly reduced, tests of
cores drilled from the area in question may be required in accordance with "Method
of Obtaining and Testing Drilled Cores and Sawed Beams of Concrete" (ASTM
C42/C42M).  In such cases, three cores shall be taken for each strength test more
than 3.5 N/mm2 below the specified value of ′.
5.12.5.3
If concrete in the structure is expected to be dry under service
conditions, cores shall be air dried for 7 days before test and shall be tested dry. If
concrete in the structure is expected to be more than superficially wet under service
conditions, cores shall be immersed in water for at least 40 hours and be tested wet.

5.12.5.4
Concrete in an area represented by core tests shall be considered
structurally adequate if the average of three cores is equal to at least 85 percent of ′
and if no single core is less than 75 percent of ′. Additional testing of cores
extracted from locations represented by erratic core strength results shall be
permitted.
5.12.5.5
If the criteria of Sec 5.12.5.4 above are not met, and if structural
adequacy remains in doubt, the responsible authority may order load tests for the
questionable portion of the structure, or take other appropriate action.
5.13
Properties of Concrete

#### 5.13.1 Strength

Strength of concrete shall be based on ′  determined in accordance with the
provisions of Sec 5.12.1.

#### 5.13.2 Modulus of Elasticity

5.13.2.1
Modulus of elasticity  for stone aggregate concrete may be taken as
44.′ (N/mm2) for values of  between 15 and 25 kN/m3 and ′ in N/mm2.
For normal density concrete,  may be taken as 4700′.
5.13.2.2
Modulus of elasticity  for brick aggregate concrete may be taken as
3750′.

#### 5.13.3 Creep

The final (30 year) creep strain in concrete  shall be predicted from
 =
!
"#
\$
(6.5.3)
Where,

 is the modulus of elasticity of the concrete at the age of loading t,

\$ is the creep coefficient.
The creep coefficient may be estimated from Figure 6.5.1. In this Figure, for uniform
sections, the effective section thickness is defined as twice the cross-sectional area
divided by the exposed perimeter. If drying is prevented by immersion in water or by
sealing, the effective section thickness shall be taken as 600 mm.
It can be assumed that about 40%, 60% and 80% of the final creep develops during
the first month, 6 months and 30 months under load respectively, when concrete is
exposed to conditions of constant relative humidity.

#### 5.13.4 Shrinkage

An estimate of the drying shrinkage of plain concrete may be obtained from Figure
6.5.2. Recommendations for effective section thickness and relative humidity are
given in Sec 5.13.3.

Figure 6.5.2 relates to concrete of normal workability made without water reducing
admixtures; such concretes shall have an original water content of about 190 litre/m3.
Where concrete is known to have a different water content, shrinkage shall be
regarded as proportional to water content within the range 150 to 230 litre /m3.
The shrinkage of plain concrete is primarily dependent on the relative humidity of
the air surrounding the concrete, the surface area from which moisture can be lost
relative to the volume of concrete and on the mix proportion.  It is increased slightly
by carbonation and self-desiccation and reduced by prolonged curing. An estimate of
the shrinkage of symmetrically reinforced concrete sections may be obtained from:
%&ℎ
'()

(6.5.4)
Where,
ℎ  is the shrinkage of the plain concrete;

is the area of steel relative to that of the concrete;
\*+  is a coefficient, taken as 25 for internal exposure and as 15 for external
exposure.

Figure 6.5.1 Effects of relative humidity, age of loading and section thickness upon creep
factor

#### 5.13.5 Thermal Strains

Thermal strains shall be calculated from the product of a suitable coefficient of
thermal expansion and a temperature change. The temperature change can be
determined from the expected service conditions and climatic data. Externally
exposed concrete does not respond immediately to air temperature change, and
climatic temperature ranges may require adjustment before use in movement
calculations.

The coefficient of thermal expansion of concrete is dependent mainly on the
expansion coefficients for the aggregate and the cement paste, and the degree of
saturation of the concrete. The thermal expansion of aggregate is related to
mineralogical composition (See Table 6.5.7)
Cement paste has a coefficient of thermal expansion that is a function of moisture
content, and this affects the concrete expansion as shown in Fig 6.5.3. It may be seen
that partially dry concrete has a coefficient of thermal expansion that is
approximately 2 × 10-6/oC greater than the coefficient for saturated concrete.
5.14
Concreting in Adverse Weather

#### 5.14.1 Concreting shall be avoided during periods of near freezing weather.

#### 5.14.2 During hot weather, proper attention shall be given to ingredients,

production methods, handling, placing, protection, and curing to prevent excessive
concrete temperatures or water evaporation that could impair required strength or
serviceability of the member or structure.

#### 5.14.3 During rainy weather, proper protection shall be given to ingredients,

production methods, handling and placing of concrete. If required in the opinion of
the engineer, the concreting operation shall be postponed and newly placed concrete
shall be protected from rain after forming proper construction joint for future
continuation.

Figure 6.5.2 Drying shrinkage of normal-weight concrete

Table 6.5.7: Thermal Expansion of Rock Group and Related Concrete
Aggregate Type
Typical Coefficient of Expansion (1 × 10-6/oC)
Aggregate
Concrete
Flint, quartzite
Granite, basalt
Limestone

Figure 6.5.3 Effect of dryness upon the coefficient of thermal expansion of hardened
cement and concrete
5.15
Surface Finish

#### 5.15.1 Type of Finish

A wide variety of finishes can be produced. Surface cast against forms may be left as
cast, e.g. plain or profiled, the initial surface may be removed, e.g. by tooling or
sandblasting, or the concrete may be covered, e.g. by paint or tiles; combinations of
these techniques may also be adopted, e.g. a ribbed profile with bush hammered ribs.
Upper surfaces not cast against forms may be trowelled smooth or profiled, e.g. by
tamping; the initial surface may be removed, e.g. by spraying, or it may be covered,
e.g. by a screed or plastic floor finish. When selecting the type of finish,
consideration shall be given to the ease of producing a finish of the required

standard, the viewing distance and the change of appearance with time. In the case of
external surfaces, account shall be taken of the weather pattern at the particular
location, any impurities in the air and the effect of the shape of the structure upon the
flow of water across its surface. Such considerations will often preclude the
specification of surfaces of uniform colour as these are very difficult to produce and
deteriorate with time, particularly if exposed to the weather.

#### 5.15.2 Quality of Finish

A high quality finish is one that is visually pleasing; it may include colour variations
and physical discontinuities but these are likely to be distributed systematically or
randomly over the whole surface rather than being concentrated in particular areas.
When deciding on the quality of finish to be specified, consideration should be given
to the viewing distance and the exposure conditions.
There is no method whereby the quality of finish that will be accepted can
unequivocally be defined. To achieve the quality required calls for good
communication between experienced personnel conversant with the production of
finishes and close collaboration with the site. The quality of finish can be identified
in the following very broad terms:
(a)
Class 2 applies to surfaces that are to be exposed to view but where
appearance is not critical; such surfaces might be  the walls of fire escape
stairs or plant rooms and columns and beams of structures that are
normally viewed in the shade, e.g. car parks and warehouses;
(b)
Class 1 is appropriate to most surfaces exposed to view including the
external walls of industrial, commercial and domestic buildings;
(c)
Special class is appropriate to the highest standards of appearance, such
as might be found in prestigious buildings, where it is possible to justify
the high cost of their production.
(d)
These broad descriptions may be amplified by written descriptions of the
method of finish, by photographs, by samples or by reference to existing
structures.

#### 5.15.3 Type of Surface Finish

Smooth off-the-form and board marked finishes are not recommended for external
use, but where they are specified for interior use the following types may be quoted
for the guidance of both designers and contractor. Designers should appreciate that it
is virtually impossible to achieve dense, flat, smooth, even coloured blemish free
concrete surfaces directly from the form work. Some degree of making good is
inevitable, even with precast work.
(a)
Type A finish: This finish is obtained by the use of properly designed
formwork or moulds of timber, plywood, plastics, concrete or steel. Small
blemishes caused by entrapped air or water may be expected, but the
surface should be free from voids, honeycombing or other blemishes.

(b)
Type B finish: This finish can only be obtained by the use of high quality
concrete and formwork. The concrete shall be thoroughly compacted and
all surfaces shall be true, with clean arises. Only very minor surface
blemishes shall occur, with no staining or discoloration from the release
agent.
(c)
Type C finish: This finish is obtained by first producing a type B finish.
The surface is then improved by carefully removing all fins and other
projections, thoroughly washing down, and then filling the most
noticeable surface blemishes with a cement and fine aggregate paste to
match the colour of the original concrete. The release agent should be
carefully chosen to ensure that the concrete surface will not be stained or
discoloured. After the concrete has been properly cured, the face shall be
rubbed down, where necessary, to produce a smooth and even surface.

#### 5.15.4 Production

The quality of a surface depends on the constituents and proportions of the concrete
mix, the efficiency of mixing, the handling and compaction of the concrete and its
curing. The characteristics of the formwork and the release agent may also be of
critical importance. Requirements may be stated for any aspect of production that
might contribute towards the achievement of the required type of quality of finish.

#### 5.15.5 Inspection and Making Good

The surface of the concrete shall be inspected for defects and for conformity with the
specification and, where appropriate, for comparison with approved sample finishes.
Subject to the strength and durability of the concrete being unimpaired, the making
good of surface defects may be permitted but the standard of acceptance shall be
appropriate to the type and quality of the finish specified and ensure satisfactory
performance and durability. On permanently exposed surfaces great care is essential
in selecting the materials and the mix proportions to ensure that the final colour of
the faced area blends with the parent concrete in the finished structure.
Voids can be filled with fine mortar, preferably incorporating styrene butadiene
rubber (SBR) or polyvinyl acetate (PVA), while the concrete is still green or when it
has hardened. Fine cracks can be filled by wiping a cement grout, an SBR, PVA or
latex emulsion, a cement/SBR or a cement/PVA slurry across them. Fins and other
projections shall be rubbed down.

#### 5.15.6 Protection

High quality surface finishes are susceptible to damage during subsequent
construction operations and temporary protection may have to be provided in
vulnerable areas. Examples of such protective measures include the strapping of laths
to arrises and the prevention of rust being carried from exposed starter bars to
finished surfaces.
5.16
Formwork

#### 5.16.1 Design of Formwork

5.16.1.1
Forms shall result in a final structure that conforms to shapes, lines, and
dimensions of the members as required by the design drawings and specifications.
5.16.1.2
Forms shall be substantial and sufficiently tight to prevent leakage of
mortar.
5.16.1.3
Forms shall be properly braced or tied together to maintain position and
shape.
5.16.1.4
Forms and their supports shall be designed so as not to damage
previously placed structure.
5.16.1.5
Design of formwork shall include consideration of the following factors:
(a)
Rate and method of placing concrete;
(b)
Construction loads, including vertical, horizontal and impact loads;
(c)
Special form requirements for construction of shells, folded plates,
domes, architectural concrete, or similar types of elements.
5.16.1.6
Forms for prestressed concrete members shall be designed and
constructed to permit movement of the member without damage during application
of prestressing force.

#### 5.16.2 Removal of Forms and Shores

5.16.2.1
No construction loads shall be supported on, nor any shoring removed
from, any part of the structure under construction except when that portion of the
structure in combination with remaining forming and shoring system has sufficient
strength to support safely its weight and loads placed thereon.
5.16.2.2
Sufficient strength shall be demonstrated by structural analysis
considering proposed loads, strength of forming and shoring system, and concrete
strength data. Structural analysis and concrete strength test data shall be furnished to
the engineer when so required.

5.16.2.3
No construction loads exceeding the combinations of superimposed
dead load plus specified live load shall be supported on any unshored portion of the
structure under construction, unless analysis indicates adequate strength to support
such additional loads.
5.16.2.4
Forms shall be removed in such a manner as not to impair safety and
serviceability of the structure. All concrete to be exposed by form removal shall have
sufficient strength not to be damaged thereby.
5.16.2.5
Forms supporting prestressed concrete members shall not be removed
until sufficient prestressing has been applied to enable prestressed members to carry
their dead load and anticipated construction loads.

#### 5.16.3 Conduits and Pipes Embedded in Concrete

5.16.3.1
Conduits, pipes and sleeves of any materials not harmful to concrete and
within the limitations specified herein shall be permitted to be embedded in concrete
with the approval of the engineer, provided they are not considered to replace
structurally the displaced concrete.
5.16.3.2
Conduits and pipes of aluminium shall not be embedded in structural
concrete unless effectively coated or covered to prevent aluminium concrete reaction
or electrolytic action between aluminium and steel.
5.16.3.3
Conduits, pipes, and sleeves passing through a slab, wall, or beam shall
not impair significantly the strength of the construction.
5.16.3.4
Conduits and pipes, with their fittings, embedded within a column shall
not displace more than 4 percent of the area of cross-section on which strength is
calculated or which is required for fire protection.
5.16.3.5
Except when drawings for conduits and pipes are approved by the
engineer, conduits and pipes embedded within a slab, wall or beam (other than those
merely passing through) shall satisfy the following:
(a)
They shall not be larger in outside dimension than one third (1/3) the
overall thickness of slab, wall, or beam in which they are embedded.
(b)
They shall not be spaced closer than 3 diameters or widths on centre.
(c)
They shall not impair significantly the strength of the construction.
5.16.3.6
Conduits, pipes and sleeves shall be permitted to be considered as
replacing structurally in compression the displaced concrete provided :
(a)
They are not exposed to rusting or other deterioration.
(b)
They have nominal inside diameter not over 50 mm and are spaced not
less than 3 diameters on centres.

5.16.3.7
Pipes and fittings shall be designed to resist effects of the material,
pressure, and temperature to which they will be subjected.
5.16.3.8
No liquid, gas, or vapour, except water not exceeding 30oC nor 0.3
N/mm2 pressure, shall be placed in the pipes until the concrete has attained its design
strength.
5.16.3.9
In solid slabs, piping, unless it is for radiant heating, shall be placed
between the top and bottom reinforcements.
5.16.3.10
Concrete cover for pipes, conduits, and fittings shall be not less than 40
mm for concrete exposed to earth or weather, nor 20 mm for concrete not exposed to
weather or in contact with ground.
5.16.3.11
Reinforcement with an area not less than 0.002 times the area of
concrete section shall be provided normal to piping.
5.16.3.12
Piping and conduit shall be so fabricated and installed that cutting,
bending, or displacement of reinforcement will not be required.

#### 5.16.4 Construction Joints

5.16.4.1
Surface of concrete construction joints shall be cleaned and laitance
removed.
5.16.4.2
Immediately before new concrete is placed, all construction joints shall
be wetted and standing water removed.
5.16.4.3
Construction joints shall be so made and located as not to impair the
strength of the structure.  Provision shall be made for transfer of shear and other
forces through construction joints. See Sec 6.4.5.9.
5.16.4.4
Construction joints in floors shall be located within the middle third of
spans of slabs, beams and girders.  Joints in girders shall be offset a minimum
distance of two times the width of intersecting beams.
5.16.4.5
Beams, girders, or slabs supported by columns or walls shall not be cast
or erected until concrete in the columns or walls is no longer plastic.
5.16.4.6
Beams, girders, haunches, drop panels and capitals shall be placed
monolithically as part of a slab system unless otherwise shown in the design
drawings or specifications.
5.17
Shotcrete

#### 5.17.1 General

Shotcrete shall be defined as mortar or concrete pneumatically projected at high
velocity onto a surface. Except as specified in this Section, shotcrete shall conform to
the provisions of this Code regarding plain concrete or reinforced concrete.

#### 5.17.2 Proportions and Materials

Shotcrete proportions shall be such that suitable placement is ensured using the
delivery equipment selected, and shall result in finished in place hardened shotcrete
meeting the strength requirements of Chapter 6.

#### 5.17.3 Aggregate

Coarse aggregate, if used, shall not exceed 20 mm in size.

#### 5.17.4 Reinforcement

The maximum size of reinforcement shall be 16 mm Ø bars unless it can be
demonstrated by preconstruction tests that adequate embedment of larger bars can be
achieved. When 16 mm Ø or smaller bars are used, there shall be a minimum
clearance of 60 mm between parallel reinforcing bars. When bars larger than 16 mm
Ø are permitted, there shall be a minimum clearance between parallel bars equal to
six diameters of the bars used. When two curtains of steel are provided, the curtain
nearest the nozzle shall have a spacing equal to 12 bar diameters and the remaining
curtain shall have a minimum spacing of 6 bar diameters.
Lap splices in reinforcing bars shall be by the noncontact lap splice method with at
least 50 mm clearance between bars. The engineer may permit the use of contact lap
splices when necessary for the support of the reinforcement, provided it can be
demonstrated by means of preconstruction testing that adequate embedment of the
bars at the splice can be achieved and provided further that the splices are placed so
that the plane containing the centres of the two spliced bars is perpendicular to the
surface of the shotcrete work. Shotcrete shall not be applied to spirally tied columns.

#### 5.17.5 Preconstruction Tests

When required by the engineer a test panel shall be shot, cured, cored or sawn,
examined and tested prior to commencement of the project. The sample panel shall
be representative of the project and simulate job conditions as closely as possible.
The panel thickness and reinforcing shall reproduce the thickest and the most
congested area specified in the structural design. It shall be shot at the same angle,
from a similar distance, using the same nozzleman and with the same concrete mix
design that will be used on the project.

#### 5.17.6 Rebound

Any rebound or accumulated loose aggregate shall be removed from the surfaces to
be covered prior to placing the initial or any succeeding layers of shotcrete.  Rebound
shall not be reused as aggregate.

#### 5.17.7 Joints

Except where permitted, unfinished work shall not be allowed to stand for more than
30 minutes unless all edges are sloped thin. Before placing additional material
adjacent to previously applied work, sloping and square edges shall be cleaned and
wetted.

#### 5.17.8 Damage

An in-place shotcrete which exhibits sags or sloughs, segregation, honeycombing,
sand pockets or other obvious defects shall be removed and replaced.

#### 5.17.9 Curing

During the curing periods, shotcrete shall be maintained above 5O C and in moist
condition. In initial curing, shotcrete shall be kept continuously moist for 24 hours
after placement is complete. Final curing shall continue for seven days after
shotcreting, for three days if high early strength cement is used, or until the specified
strength is obtained. Final curing shall consist of a fog spray or an approved moisture
retaining cover or membrane. In sections of a depth in excess of 300 mm, final
curing shall be the same as that for initial curing.

#### 5.17.10 Strength Test

Strength test for shotcrete shall be made by an approved agency on three
representative specimens of Core or Cube that have been water soaked for at least 24
hours prior to testing. When the maximum size of aggregate is larger than 10 mm,
core specimens shall not be less than 75 mm in diameter or the size of cube specimen
shall not be less than 75 mm. When the maximum size of aggregate is 10 mm or
smaller, core specimens shall not be less than 50 mm in diameter or the size of cube
specimen shall not be less than 50 mm. Specimens shall be taken in accordance with
one of the following provisions:
(a)
From work: taken at least one from  each shift but not less than one for each 20
m3  of shotcrete;
(b)
From test panels: taken not less than once each shift nor less than one for each
20 m3 of shotcrete placed. When the maximum size aggregate is larger than 10
mm, the test panels shall have a minimum dimension of 450 mm by 450 mm.
When the maximum size aggregate is 10 mm or smaller, the test panels shall
have a minimum dimension of 300 mm by 300 mm. Panels shall be gunned in
the same position as the work, during the course of the work and by the same
nozzlemen doing the work. The condition under which the panels are cured
shall be the same as the work.

The average strength of three cores from a single panel shall be equal to or exceed
0.85 ′ with no single core less than 0.75 ′  .  The average strength of three cubes
taken from a single panel must equal or exceed  ′  with no individual cube less than
′  . To check testing accuracy, locations represented by erratic core strengths may be
retested.

#### 5.17.11 Inspections

5.17.11.1
Inspection during placement
When shotcrete is used for columns and beams, a special inspector is required. The
special inspector shall provide continuous inspection to the placement of the
reinforcement and shotcreting and shall submit a statement indicating compliance
with the plans and specifications.
5.17.11.2
Visual examination for structural soundness of in-place shotcrete
Completed shotcrete work shall be checked visually for reinforcing bar embedment,
voids, rock pocket, sand streaks and similar deficiencies by examining a minimum of
three 75 mm cores taken from three areas chosen by the engineer which represent the
worst congestion of reinforcing bars occurring in the project. Extra reinforcing bars
may be added to non-congested areas and cores may be taken from these areas. The
cores shall be examined by the special inspector and a report submitted to the
engineer prior to final approval of the shotcrete.

#### 5.17.12 Equipment

The equipment used in construction testing shall be the same equipment used in the
work requiring such testing unless substitute equipment is approved by the Engineer.